Community and public buildings are the staples in a community and do more than just serve the public. We work with community partners, employees and users to design a space that is practical to everyday life. We are committed to providing on schedule and within budget spaces for the community to achieve their goals.

City of Fremont, Nebraska

Location:

Scope:

Complete:

Project Area:

Fremont, NE

Addition

October 2020

21,035 SF

Disciplines:

Architecture
Structural
Mechanical
Electrical

The City of Fremont selected KPE to assess and complete designs to renovate portions of its city hall building. The scope consisted of new ADA accessible elevator, reprogramming existing spaces, new lighting, and new flooring. KPE assessed the building’s structural components. One of the challenges was to allow the building to be occupied during construction. To be more easily accommodating and less intrusive, KPE and the client determined the new elevator should be placed on the exterior of the building. Lobby areas, conference rooms, and offices were redesigned for efficient access. The project is funded in part by a community grant for ADA accommodations.

Cedar County Transit

Location:

Scope:

Complete:

Project Area:

Hartington, NE

New Building

August 2021

9,700 SF

Disciplines:

Architecture
Structural
Mechanical
Electrical

KPE provided architectural and engineering design for a new transportation facility. The facility is a pre-engineered metal building with a 8,500 SF indoor parking garage for the county transportation vehicles and a wash bay for cleaning. The space also includes a 1,200 SF office area which was required to be separated from the parking with a two-hour firewall. It includes offices, a conference/training room, and restrooms. The parking garage required ventilation and a gas detection system for monitoring carbon monoxide. KPE assisted with the bid process and performed Contract Administration / Construction Observation (CA/CO).

Morton James Public Library

Location:

Scope:

Complete:

Project Area:

Nebraska City, NE

Renovation

May 2017

18,000 SF

Disciplines:

Mechanical
Electrical

KPE was selected to provide an HVAC study and renovation design. This historical building was originally constructed in 1896. The work performed was to keep the existing features of the interior and exterior the same while replacing the currently deficient HVAC system with a more energy efficient system. During the assessment, KPE recommended a VRF system that eliminated the gas heating requirement for the building and fit seamlessly with the existing ductwork to keep interior finishes the same. The design was closely coordinated with the City’s personnel to ensure existing woodwork, wallpaper, ceilings, and other features would remain the same. The project came in under budget at $520,000 and was completed in three months.

Iowa Public Employees’ Retirement System (IPERS)

Location:

Scope:

Complete:

Project Area:

Des Moines, IA

Energy Analysis and Design

February 2012

45,185 SF

Disciplines:

Mechanical
Electrical

Energy Analysis, Engineering Design and Construction Management for State of Iowa Corporate office building. Goal of design was to reduce energy usage nearly 70% in order to make the facility Net-Zero Energy Ready. Provisions were included for the installation of future PV solar arrays to complete the transition to a Net-Zero Energy facility. Entire project was phased to allow for construction during occupancy. Project reduced electrical usage nearly 70% while producing infrastructure for Net-Zero Energy Ready status with PV solar arrays to be added later. Project received $72,000 rebate from MidAmerican Energy through Commercial New Construction Program for energy efficient design. The project earned KPE a Merit Award for Energy Efficiency Design from the Nebraska Chapter of the American Council of Engineering Companies (ACEC) 2014 Engineering Excellence awards.

Sarpy County Courthouse

Location:

Scope:

Complete:

Project Area:

Papillion, NE

Chiller Replacement

February 2018

3,000 SF

Disciplines:

Mechanical
Electrical

Provide professional mechanical/electrical/plumbing engineering design services and construction management services for a $150,000 chiller replacement project for the south courthouse building. The existing chiller had surpassed its useful life and the chiller bundle was experience leakage and was not able to be repaired. The facility hired KPE to investigate the reuse of the chiller or provide a direct replacement of the chiller and remote bundle. The building representative stated they needed the existing chiller operational and would like to replace the chiller during winter to keep the building cooled and not disrupt courthouse activities. KPE was involved in working with local vendors to get a rental chiller while temporary repairs were being done and awaiting delivery of new chiller.

York Auditorium

Location:

Scope:

Complete:

Project Area:

York, NE

HVAC Modernization

April 2021

32,000 SF

Disciplines:

Mechanical
Electrical
Structural

KPE was selected by the City’s construction manager to design the HVAC modernization for its 1940 Auditorium building. The building consists of four main areas: the arena, a children’s museum, an assembly area, and a large open basement space. All these spaces air distribution was served by one supply fan and one return fan. This caused the entire system to be operating when not all spaces were being used. The new HVAC system would zone all the four spaces separately to allow for turndown of the system when not in use for better energy efficiency. The zones being separated also would have better comfort control for the occupants.

Employee Well-Being

We help our customers by prioritizing the health and well-being of our employees. Employees have learned to work efficiently and safely from home with the benefit of extra time with family without a commute. Knowing their families are safe gives them more capacity to focus on the customer’s needs.

Quality Solutions

KPE’s commitment to deliver cost-effective and timely solutions to customer’s challenges remains constant regardless of complications that arise. The current environment allows us to demonstrate our ability to adapt to changing conditions without sacrificing quality.

Quality Solutions

KPE’s commitment to deliver cost-effective and timely solutions to customer’s challenges remains constant regardless of complications that arise. The current environment allows us to demonstrate our ability to adapt to changing conditions without sacrificing quality.

Communication

Engineers and architects communicate between all branch offices and while working on projects across the country. We are committed to efficient communication with partners and clients. KPE customers praise our response time, which is a direct result of our communication practices.

Customer Delight

We are committed to addressing your concerns and guiding you through the process. Being committed to customer delight means listening to your needs, working within your budget, and planning your building around the changing needs of our social and economic climate.

Deliver

  • KPE’s planners and designers develop and implement specialized solutions to achieve your ideal educational environment.
  • Our high percentage of licensed design staff, 65%, ensure tasks are done right the first time.
  • KPE professionals have a wide range of experience including educational and office spaces.

Assess

  • KPE professionals help clients define priorities by accurately assessing existing facilities and listening to community and educational values.
  • We provide data and options for you to simply understand the best step forward in achieving your educational needs.
  • The same team drawing your construction documents are also involved in our Forensic Investigations, which means assessing design errors and construction defects on projects designed and constructed by other firms.
  • This gives KPE designers more insight on existing buildings and allows us to more accurately prepare for otherwise potentially costly changes.

Listen

  • We exchange ideas, share expertise and – above all – we listen. Through open, candid communication, we gain consensus and create truly successful design.
  • Having all architects and engineers under the same roof allows quick and efficient communication. This efficiency is accomplished by orderly internal design coordination meetings, frequent communication between departments, documentation of decisions, and frequent detailed reports to owners.
  • We engage our clients in a collaborative dialogue throughout the process. Successful projects begin with strong relationships.